| | | | Front floor section is marked up for drilling and punching. Again, this work is carried out from below with panel clamped in final position. | | | | | | |
|
| | | | | Front floor is fitted into place. Overall, fit of these OEM-style replacement panels is very good. | | | | | |
|
| | | | Rosette welded in place. C-clamp in drain hole closes gap between pan and front jack point. Eventually seam between front and rear sections will be finished with a bead (actually a series of short beads). | | | | | | |
|
| | | | | Opening for pedals had heavy gauge reinforcement; lower portion was rotten (relic at top of photo). New lower section fabricated from 16 gauge steel. Lip was formed by clamping workpiece to oak form (center) and beating the edges. | | | | | |
|
|
|
|